job shop code matlab with due window
2016-08-23
1 0 0
no vote
Other
Earn points
This paper deals with the job shop scheduling problem with due window to
minimize the sum of weighted earliness and weighted tardiness of jobs.
This due window is a time duration between the due date and the latest
acceptable completion date, namely dealine, of a job. Penalties are
incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA),
based on a two phase schedule mechanism was introduced. To avoid the
violations of due window constraint and simultaneously reduce tardiness
costs, a chromosome repair method based on critical paths was designed
to adjust chromogene sequence. Then, on keeping tardiness costs
unchanged, an objective value revision method based on reverse
rescheduling was put forward to delay job release date for reducing
earliness costs introduced by each job.
matlab
Related Source Codes
GMSK Linear Receiver
0
0
no vote
NSGA-II algorithm
0
0
no vote
NSGA-III multi-objective optimization algorithm
0
0
no vote
Compressed sensing example
0
0
no vote
CFAR detector example
0
0
no vote
No comment