in a multi
2016-08-23
0 0 0
no vote
Other
Earn points
in a multi-program design system, and achieving a "Dispatch" the simulation. The simulation procedure is as follows : 1. Input : Job Flow document, which is stored in a series of operations to be implemented information, including five each operating data : the operations, priority, time to enter the input shaft (with an integer, as expressed to 10:10 1010), is estimated to run time (unit : minutes), the memory demand. The data item separated by a space. 2. Output : In accordance with the scheduling order of output per work- a document : "operations", "memory access time", "complete operational time", "turnaround time"; An output per line operating information. Calculate the average turnaround time and output. 3. Job Scheduling Algorithm :
Related Source Codes
Android AOA Android Open Accessory Development Usi
0
0
no vote
Golang AOA Android Open Accessory HID Control
0
0
no vote
PClite
0
0
no vote
GMSK Linear Receiver
0
0
no vote
The golden version of AFT that has been passed dow
0
0
no vote
No comment